Marine Installation Services

Ship-of-Opportunity M/V PAUL W. MURRILL before and after four day mobilization for cabled sensor installation. 2003

Ship-of-Opportunity
M/V PAUL W. MURRILL
before and after four day mobilization
for cabled sensor installation. 2003

L-3 MarPro’s marine installations are typically cabled undersea sensor systems or “short-haul” un-repeated telecommunication systems deployed from Ships-of-Opportunity using various means of cable protection and shore landing methods.

L-3 MariPro has developed a system of modular cable deployment equipment which can be trucked or shipped to a port anywhere in the world that is in close proximity to the installation location.  This method enables a local ship-of-opportunity with a local crew to be converted into a cable laying vessel generally within 3 to 4 days.

Services
Marine Services
Marine Project Management
Installation Planning and Engineering
Navigation and Cable Installation Modeling
Marine Installation
Marine Installation Services
Vessel of Opportunity
Mobilization Time Lapse Video
Cable Burial
Cable Landings
Marine Support Services and Equipment
Free-Fall Cable Packs
Cable Fault Localization
Cable Repair and Jointing Services
ROV Inspections and Recoveries
Dive Support and Underwater Construction
Modular Equipment
   
  L-3 Corporate E-mail Business Development E-mail Webmaster