| The following clauses, when specifically
referenced in the Purchase Order (P.O.) by number, form an
integral part of the Purchase Order. Unless otherwise specified,
specifications referenced herein shall be of the issue in effect
on the date of Request for Quotation. |
1.0 GOVERNMENT SOURCE INSPECTION (GSI) GSI is required prior to shipment from your
plant. Upon receipt of this order, promptly notify the Government
Representative who services your facility so appropriate planning
for Government Inspection can be made. In the event the representative
or office cannot be located, the L3DS Communications Corporation
(L3DS) Purchasing Agent should be notified immediately. Evidence
of GSI must accompany each shipment. |

|
| 2.0 SOURCE INSPECTION (AT SUPPLIERS/VENDORS
FACILITIES)
Source Inspection is required for all materials
and services supplied under the P.O. as specified below. Notify
L3DS Quality Engineering five (5) days prior to the required
inspection unless the inspection has been waived by the L3DS
Quality Engineering Manager. Evidence of L3DS Source Inspection
must accompany each shipment. If the supplier elects to utilize
automated testing programs for Final Acceptance, proof must
be provided to L3DS that the program is capable of fully testing
the material to the applicable drawing requirements. A single
verification prior to testing of the first lot of material
will suffice, unless modifications are made to the program
which requires re-verification. The following Source Inspection
requirements may be satisfied by either audit of the supplier’s
inspection and test documentation, witnessing of inspection
and test performed by the supplier, or performance of inspections
and tests by the L3DS representative. If inspections and tests
are conducted by the L3DS Representative, the supplier shall
make available its equipment and personnel. |

|
| 2.1
VERIFICATION OF ENVIRONMENTAL TESTING
Records of required testing (e.g., Qualification
Test, Reliability Demonstration, Burn-In, Sampling Test, etc.)
as specified by the P.O. must be available for review and retained
for a minimum of the life of the warranty of the supplied material
by the supplier. |

|
2.2 IN-PROCESS INSPECTION (IPI)
IPI of work in process at points selected by
L3DS Quality Assurance Engineering. |

|
| 2.3 PRE-CAP INSPECTION
Pre-Cap Inspection of microelectronic devices
shall be performed to the specification under which the device
was purchased. Any deviation to the specification shall be
submitted in writing to L3DS for approval prior to shipping. |

|
| 2.4
ACCEPTANCE TEST PROCEDURE (ATP)
Acceptance testing shall be performed to the
supplier's prepared ATP approved by L3DS. The ATP must be
submitted for L3DS approval at least forty-five (45) days prior
to acceptance testing. Upon request by the L3DS Source Inspector,
the supplier shall show evidence of formal L3DS approval of
the test procedures. |

|
2.5 PHYSICAL CONFIGURATION AUDIT
(PCA)
Supplier shall make available to the Source Inspector drawings,
test procedures, etc., used in the production, inspection,
and test of the procured product specified by the L3DS Purchase
Order. |

|
| 3.0
QUALITY ASSURANCE MANAGEMENT
If the supplier uses facilities other than
there own, that facility is subject to and shall adhere to
the same conditions of the L3DS Purchase Order. All certifications
submitted, as objective evidence must indicate the name and
location(s) of the facility providing the service/material.
The supplier shall be certified to the ISO 9000 standard or,
at a minimum, conform to the following sections of ISO 9001:2000
standards:
- 4.2.2 Documented Quality Manual
- 4.2.3 Control of Documents
- 4.2.4 Control of Records
- 7.4 Purchasing
- 7.6 Control of Monitoring and Measuring Devices
- 8.2.3 Monitoring and Measurement of Processes
- 8.2.4 Monitoring and Measurement of Products
- 8.3 Control of Non-conforming Product
- 8.5 Improvement, Corrective Action, and Preventive Action
Objective
evidence of all inspection/ tests used to verify or demonstrate
compliance with applicable specifications must be available
for review and retained as specified in the Federal Acquisition
Regulation (FAR), section 4.703, unless specified differently
in the L3DS contract.
L3DS approval of supplier's special processes, operating
personnel certifications, equipment and process procedures
may be required. Copies of procedures and operator certifications
shall be provided upon request. If the supplier uses facilities
other than their own, that facility is subject to the same
conditions of L3DS approval. All certifications supplied,
as objective evidence must indicate the name and location(s)
of the facility performing each special process.
L3DS reserves the right to require failure analysis on any
or all failures that may occur that are associated with the
item(s) delivered on this P.O.
L3DS, L3DS ‘s customer and/or a government representative
reserve the right to perform an inspection and observe the
performance of supplier’s work on L3DS products at the supplier’s
facility. |

|
| 3.1 SUPERCEDED BY clause 3.0. |
| 3.2 SUPERCEDED BY clause 3.0. |
| 3.3 PROGRAM QUALITY ASSURANCE PLAN
A detailed Quality Assurance Plan shall be
submitted to L3DS for approval at least sixty (60) days prior
to acceptance inspection/test of materials to be provided under
this P.O. Major inspection and test control points are to
be identified in relation to the overall manufacturing cycle
(flow plan), and acceptance criteria at these points are to
be specified. Sample Acceptance Inspection/Test forms and
work instructions are to be included. The supplier's Quality
Assurance Procedures Manual will be provided with the plan. |

|
| 3.4 SUPERCEDED BY clause 3.0. |
| 3.5
CALIBRATION SYSTEM
The supplier shall maintain a calibration system
for test and measurement equipment, which complies with the
requirements of ISO 9000. The supplier shall submit a Certificate
of Calibration, certifying traceability to NIST and signed
by the supplier’s authorized representative. |

|
4.0 FIRST ARTICLE ACCEPTANCE
First Article Acceptance is required for the first piece(s) of
each part number supplied under the purchase order. The supplier
shall submit a written First Article Report stating actual
values and acceptance for each characteristic of the drawing/
specification. This First Article Report shall adhere to
the requirements of AS9102 or as specified within L3DS Internal
Procedure (QWI 121-009). If Source Inspection (P.O. Clause
2) is also imposed, L3DS reserves the right to verify any
portion of the seller's First Article Inspection as part
of the Source Inspection. If a First Article Report has
been previously supplied for the part number/ revision for
a previous purchase order, the previous First Article submission
shall be sufficient unless:
- There has been a break in production of greater than one
(1) year
- The physical location of the production processes has changed.
The supplier shall submit all applicable certifications,
i.e., material cert., C of C’s, etc with each shipment related
to this QA Clause.
Any changes to the drawing, test procedure, material, method,
or processes made after First Article has been submitted to
and approved by L3DS to the original part number and/ or revision
stated on the purchase order shall be submitted to L3DS for
approval prior to incorporation of such changes. A re-submission
of First Article Report is required. The re-submitted First
Article Report need only contain measured values and acceptance
for the characteristic(s) changed as a result of the part number/
revision change. |

|
| 5.0 SUPERCEDED BY CLAUSE 4.0. |
| 6.0 SUPERCEDED BY clause 3.0. |

|
6.1 CERTIFICATE OF CONFORMANCE (C of C)
The seller shall provide a C of C with
each shipment of material. The C of C shall contain, at
a minimum, the L3DS P.O. number, the part number specified
on the P.O., the serial number(s) (if applicable), the date
lot code(s) (if applicable), the date of execution, any applicable
VRIAs (deviations/waivers), and a certification statement.
The certification statement shall explicitly certify that
the parts or services supplied meet all L3DS P.O. and associated
specification package requirements. Seller shall include
a copy of the C of C with Seller’s product shipper (invoice/packing
sheet). The C of C shall be stamped and/or signed by the
seller's authorized representative.
If the applicable P.O. contains special processes as identified
by L3DS, a C of C shall be provided by the seller, or their
sub-contract process sources (sub-tiers), that performed
the actual processes specified. This certification shall
act as the seller’s, or their sub-tier sources, validation
that the seller performing the work was qualified for the
special process(es) in question by L3DS’ customer prior
to delivery and that the work performed is compliant with
the associated standards. This C of C shall contain at
a minimum all those requirements previously stated as well
as a description of the process type performed and the
specification it was performed to. The C of C shall be
stamped and/or signed by the seller's, or their sub-tier
sources’, authorized representative.
All substantiating certificates and documentation that support
this certification shall be available on file at the supplier’s
facility. Supporting documentation shall be supplied to L3DS
upon request. |

|
6.2
CERTIFIED VARIABLE/ATTRIBUTE DATA
The supplier shall provide variable data (measured
values) and/or attribute (go, no-go) data for each item delivered
showing conformance to all inspections/tests specified by the
applicable specifications (specification and source control
drawings) or supplier (L3DS approved) Acceptance Test Procedures. |

|
| 6.3
MIL-STD-883 SCREENING RESULTS
The supplier shall provide screening results
in accordance with MIL-STD-883 except in the case of a commercial
part, in which the manufacturer part number does not contain
5962. |

|
| 6.4
SOLDER COMPOSITION
All purchased solder shall meet the composition
requirements of J-STD-006 for solder and J-STD-005 for solder
paste. |

|
| 6.5
COMPONENT RE-SCREENING – MICROCIRCUITS
The supplier shall perform component re-screening
and marking in accordance with L3 Specification 414575. This
component testing shall be in addition to any other testing
required by the original component specification. The supplier
shall provide objective evidence of the testing. |

|
| 6.6
COMPONENT RE-SCREENING – SEMICONDUCTORS
The supplier shall perform component re-screening
and marking in accordance with L3 Specification 414576. This
component testing shall be in addition to any other testing
required by the original component specification. The supplier
shall provide objective evidence of the testing. |

|
7.0 STANDARDS OF WORKMANSHIP
The supplier must maintain written standards
of workmanship directly applicable to the nature and level
of work performed under the P.O. A copy shall be supplied upon
request. NOTE: L3DS reserves the right to impose its own workmanship
standards. |

|
| 7.1 SUPERCEDED BY CLAUSE 7.4. |
| 7.2 SUPERCEDED BY CLAUSE 7.4. |
| 7.3 If this clause is ON P.O., use clause 7.4. |
| 7.4 WORKMANSHIP PER IPC/EIA J-STD-001 or IPC-A-610. |
| 8.0 SUPERCEDED BY clause 3.0. |
| 9.0 CHEMICAL/ PHYSICAL CERTIFICATION OR ANALYSIS |

|
9.1 CERTIFICATION
Certification shall be furnished with
each shipment. The heat, batch, melt numbers, etc. shall
be included in the certificate. |

|
9.2 ANALYSIS
When required by the Purchase Order, analysis
shall be furnished with each shipment. The heat, batch, melt
numbers, etc. shall be included in the analysis. |

|
| 10.0 CERTIFIED LIGHT TEST DATA
The supplier shall take light measurements
in accordance with the applicable specifications. The supplier
shall furnish light data with each product delivery. The light
measurement procedure and furnished data requirements shall
be explicitly approved by L3DS prior to the delivery of parts. |

|
| 11.0 LIMITED LIFE MATERIAL
The supplier shall identify each item, package,
or container with the manufacturing date and shelf life expiration
date. Unless otherwise specified in the procurement documentation,
limited life materials shall have a minimum of 80% of shelf
life remaining on the date of shipment. Rubber products shall
be identified as to cure and mold date. |

|
12.0 PRINTED WIRING BOARDS (PWB's)
PWB's shall be supplied in accordance with
QA 122-305B, Supplier Quality Assurance Requirement Clauses
- Printed Wiring Boards. |

|
| 13.0 SUPERCEDED BY clause 3.0. |
| 14.0 SUPERCEDED BY CLAUSE 2.4. |
15.0 PACKAGING
Unless otherwise specified in the Purchase
Order, the supplier shall package all material in a manner
that will ensure protection against corrosion, oxidation,
deterioration, and physical damage during shipment to L3DS.
All metal parts, etc. shall be individually wrapped to protect
finished surfaces. Electronic parts such as resistors, capacitors,
transistors, diodes, etc., SHALL NOT BE BULK PACKAGED. THE
MAXIMUM QUANTITY OF PARTS TO BE PACKAGED IN THIS MANNER SHALL
BE TWENTY (20) PIECES OR LESS. When parts are procured directly
from the manufacturers “off-the-shelf" or "over-the-counter" packaging
shall be acceptable. Cardboard spools or spooling materials
will not be used. Refer to FED-STD-3561, except for devices
in (A), (B) and (C) below. Devices shall be packaged in
accordance with the following requirements.
A. OPTICAL FILM
Each piece of optical film shall be individually
placed into an “ESD” bag to prevent contamination and protect
from static. Once film is in bag, place a rigid piece of
cardboard on either side of bag. Cardboard shall then
be secured with tape on at least two edges of the cardboard
and shall be labeled with optical film part number. The packaging
sequence shall be as follows: cardboard/bagged film/cardboard/cardboard/bagged
film/cardboard. Place material flat into a container to prevent
deformation.
B. STATIC SENSITIVE DEVICES
Static sensitive devices shall be packed
in a manner that shields the item from extraneous radiation
and/or static electricity or discharge.
C. N/A
D. PLASTIC INTEGRATED
SURFACE MOUNT DEVICES AND PLASTIC ENCAPSULATED
COMPONENTS
Plastic Integrated surface mount devices
and plastic encapsulated components are to be dry packed
using moisture barrier bags (MBB), desiccant, and a humidity
indicator card. A label is to be affixed to the container
indicating the elapsed time from bake-out to vacuum sealing
of parts.
E. N/A
F. ADHESIVE GASKETS
Adhesive gaskets shall be packaged
with cardboard inserts between each part to prevent damage.
Parts shall be packaged flat in a box to prevent deformation.
Also the parts shall be packaged in a plastic covering.
G.
ELECTRONIC COMPONENT TAPE AND REEL
When tape and reel packaging is specified
on the purchase order for electronic components, the
tape and reel processing shall be performed in accordance
with EIA-481 Rev. C, paragraph 4.14.
H. L3DS requires
that all Pb-free parts be labeled Pb-free |

|
16.0 MIL-PRF-19500 SEMICONDUCTOR DEVICES
MIL-PRF-19500 semiconductor devices shall
be supplied in accordance with MIL-PRF-19500. |

|
| 17.0 SUPERCEDED BY clause 11.0. |
| 18.0 COMMERCIAL ITEM |
| 18.1 SUPERCEDED BY clause 3.0 and CLAUSE 6.1. |
| 18.2 SUPERCEDED BY clause 3.0 and CLAUSE 6.1. |
| 19.0 INACTIVE CLAUSE |

|
20.0 INSPECTION CRITERIA FOR PURCHASED DISPLAYS
The supplier shall meet the requirements
defined in L-3 Quality Work Instruction QWI 121-222, Inspection
Criteria for Purchased Displays Other Than CRTs. In the
event specific acceptance criteria for certain defects are
defined by program contract, than those criteria shall supersede
the requirements of QWI 121-222. |

|
21.0 SOFTWARE/COMPLEX ELECTRONIC HARDWARE QUALITY
ASSURANCE REQUIREMENTS
L-3 reserves the right to conduct a Software/
Complex Electronic Hardware (CEH) quality assurance audit
on supplier’s processes and/or past software/CEH development/verification
projects to assure an adequate system is in place to support
this purchase order (PO).
L-3 will delineate specific information
to supplier regarding this PO as attached via contracts letter.
Information may include, but is not limited to:
- L-3 supplied equipment, documents, drawings, software,
CEH, etc.
- Deliverables to be made by supplier throughout the software/CEH
PO.
- Specifications to which software/CEH development and/or
verification processes and documents must comply.
|

|
| 21.1 MIL-STD-498 |
| 21.2 MIL-STD-2167 / MIL-STD-2168 |
| 21.3 ISO 9000-3 |
| 21.4 IEEE 12207 |
| 21.5 DO-178B Level A |
| 21.6 DO-178B Level B |
| 21.7 DO-178B Level C |
| 21.8 DO-178B Level D |
| 21.9 DO-254 Level A |
| 21.10
DO-254 Level B |
| 21.11 DO-254 Level C |
| 21.12 DO-254 Level D |

|
22.0 QUALIFICATION OF SPECIAL PROCESSORS
The seller (supplier) and/or seller’s
sub-contract process sources (sub-tiers) that perform the
special processes detailed in this section must be qualified
by L-3’s customer to the applicable mil standard prior to
the shipment of any hardware. To determine the specific
end customer for this contract and for access to a list of
customer approved processors for specific special processes,
please contact your sub-contract administrator. |

|
| 22.1 SOLDERING |
| 22.2
CHEMICAL CONVERSION COATING OF ALUMINUM |
| 22.3 ANODIZING |

|
23.0 PREFERENCE FOR DOMESTIC SPECIALTY METALS (DFARS 252.225-7014)
The supplier (including its suppliers
at every tier) shall not incorporate into military parts,
components, and/or end item deliverables “specialty metals”
(including titanium and stainless steel) which have been
melted outside the United States, its possessions, or Puerto
Rico, unless certain limited exceptions set forth in the
clause or DFARS 225.7002-2 apply. One such exception is for
specialty metals melted in a qualifying country or incorporated
into an article manufactured in a qualifying country. |

|
24.0 LEAD FREE SOLDER EXEMPTION
L3DS products qualify for an exemption
from the European Union’s “Reduction of Hazardous Substances
(RoHs)” environmental ban, therefore, L3DS will not require
RoHs compliant parts. L3DS does require tin-lead finish
components when available.
L3DS does require that any process changes, material content
changes or any product substitution, must receive prior
written authorization from L3DS prior to shipping to L3DS
for any goods meeting the before stated conditions. When
purchase order specifies a pure tin finish, only matte
tin finish is allowable. Bright tin is not allowed.
For any contract violations, L3DS reserves our rights under
law, including but not limited to claims for consequential
damages. |

|
| 25.0 LEADED SOLDER FINISH
Prior to shipment to L3DS, Supplier shall have
all component termination areas hot solder dipped with a minimum
of 3% lead alloy solder. When component are on reels, each
reel shall bear a marking stating lead content present on components.
Components in all other packages (stick, tray, loose, etc.)
shall be individually marked with a blue colored dot of permanent
ink. The ink marking shall not interfere with other markings
on the component. Supplier's Certificate of Compliance shall
attest to the 3% lead content in the resulting termination
finish. |

|
26.0 SUPPLIER PROCESS CHANGE CONTROL
The supplier agrees that the work produced
internally and or the work procured from sub-tier suppliers
under this contract shall comply with the following requirements
unless a documented request for change is approved by L3DS.
- Work shall not be moved to another production facility.
- No changes shall be made to the design, manufacturing
processes, materials or activities that affect form, fit
or function without prior approval from L3DS.
- A fit, form and function analysis shall be performed,
documented and included with any request for change.
- A documented process shall be in place to review, identify
and submit a request for changes to L3DS.
A documented request for the above changes
shall be submitted to L3DS 60 days prior to planned implementation.
The change will not be implemented until it has been approved
by L3DS in writing.
The supplier shall notify L3DS in writing when there are significant
organization changes such as company name or senior quality
management. |

|
27.0 RECORD RETENTION
Unless otherwise specified by L3DS, the supplier shall maintain
on file all documentation identified by the contract, purchase
order and other applicable documents for a minimum of (7) years
from the date of final payment. The supplier must apply this
requirement to lower-tier suppliers if the inspection and test
records are not forwarded to the supplier. These records shall
be available for release upon request by L3DS or its customers.
When the purchase order includes a text note for a requirement
listed below, the specified quality documentation/data is required
to be provided with the shipment:
First Article Inspection
Special Processor Traceability
Solder ability Certifications
Unique Identification |

|
28.0 MATERIAL REVIEW BOARD AUTHORIZATION
Independent Material Review
Board (MRB) authority is not granted to the supplier. The supplier
shall not submit non-conforming material to L3DS unless L3DS
Quality Engineering has previously approved a Vendor Request
for Information/Action (VRIA). The VRIA shall indicate all
non-conformance, reason for non-conformance, quantity non-conforming,
and the recommended corrective action to be taken. NOTE: The
VRIA form can be obtained through the L3DS Purchasing Office
on request.
|

|
29.0 PUBLIC SAFETY – FIRST ARTICLE ACCEPTANCE
The supplier shall obtain First Article Acceptance from L3DS when any of these
situations occur:
- A new part or
product,
- Correction of
a discrepancy on a previously submitted part,
- Product modified
by an engineering change,
- A change in
manufacturing source(s), process (es), inspection method(s),
location of manufacture, tooling or materials, that can
potentially affect fit, form of function, and
- A break in production of greater
than one (1) year
The supplier shall submit a written First Article Inspection
Report in accordance with Production Part Approval Process
(PPAP) 3rd Edition requirements or QWI 121-009, SAE AS9102
Aerospace First Article Inspection Requirements.
Suppliers submitting PPAP documents
shall use Level 3 as the default level for all PPAP submissions
unless specified otherwise by L3DS Quality Engineering. |

|
| 30.0 COUNTERFEIT PARTS
Seller is hereby notified that the delivery
of suspect/counterfeit parts is of special concern to Buyer. If
suspect/counterfeit parts are furnished under this order or
are found in any of the goods delivered hereunder, such items
will be impounded by Buyer. The Seller shall promptly
replace such suspect/counterfeit parts with parts acceptable
to the Buyer and the Seller shall be liable for all costs,
including but not limited to Buyer’s internal and external
costs, relating to the removal and replacement of said parts. To
further mitigate the possibility of the inadvertent use of
counterfeit parts, the Seller shall only purchase components
and parts procured directly from the Original Equipment Manufacturer
(OEMs), through the OEM’s authorized distributor chain, or
if through an independent Distributor, Seller must make available
to Buyer (if Buyer requests) OEM documentation that authenticates
traceability of the components to the applicable OEM |

|