L-3 Communications
L-3 Communications
 HOME |  E&TS HIGHLIGHTS |  ABOUT US |  CAREERS |  CONTACT US  
ENGINEERING AND TECHNICAL SERVICES
Integrated Sustainment
Corrosion Control
Case Studies
GSA Schedules
White Papers

Product Life Cycle Support & Management

Integration & Test

Electronic Product Solutions

Data Visualization

Space/Ground Operations Support & Simulation

Satellite/Launch Operations Support

Configuration & Data Management

Decision Support

Software/Hardware Engineering

System Analysis

System Support Engineering

Technical Order/Document Digitization

CASE STUDIES


This page lists the case studies currently in our library. We continually add new case studies as we demonstrate our continual process improvement initiatives and the effectiveness of our Integrated Sustainment applications in streamlining performance and increasing savings or cost avoidance over a program or project’s lifecycle.

Featured Studies:
Parts database automation - >$4.5M cost avoidance and productivity gains
Developed custom routers - 63 hours saved and improved production control
Defect and Change Management System ->$2.5M cost avoidance
Basis-of-Estimate tool development - projected savings is $756,000 per year
Document Production & Presentations (DP) - 8.3% improvement in productivity
Software Analysis & Design automation technique - a $70,800 per year savings
Technical Order (TO) Management - at least 280 hours saved annually
Data Management (DM) - 1,400 Technical Writer hours saved
Automated QC process for aperture cards - Cost Avoidance and 417 hours saved
Database optimization - Cost avoidance totaling $30,315
Document and Data Control - Annual savings of 80 hours
Technical Order storage and process improvements - 42% productivity increase
Automated Document Production & Presentations process - 71 hours saved
Automatic grading and certification process - 50 hours per annum saved
Document Management System (DMS) automation - $172 savings per report
Document Production & Presentations (DP) automation - saves 47.7 hours annually
CM-DP interdepartmental transfer time reduction - 70 hour savings per year
Online document approval process - total savings of 390 hours

E&TS case studies report on real-life performance (in particular the implications of Integrated Sustainment), and the degree to which metrics are used to trend and track progress, the impact of people and processes, and the realities of how the combination of these practices, tools and processes amount to real savings and/or cost avoidance. The case studies range in length and scope. Their authors vary from program/project managers, engineers, technicians, logisticians, administrators and scientists. Naturally, the conclusiveness of their findings and level of insights are very situational. But we believe all of the studies here have something to offer - either as a pedagogic model for leaders, sustainers, systems engineers and logisticians or as a first step in building a shared knowledge base on how the benefits of Integrated Sustainment really impact and are experienced by their users.